- This circuit is among the lowest reliability performers on the BGE transmission systems. Rebuilding this line addresses multiple reliability concerns including; aging infrastructure, aging conductor splices and avian interference
Project Description
- The scope of the project is to remove the existing two single-circuit 115 kV tower lines (CKT 110901-1 & 110901-2) and replace with a new single-circuit monopole structure line
- Overall project length is approximately 1.8 miles
- This project is subject to PSC approval and design changes
Resources
Timeline
Begin Design and Engineering
Begin Design and Engineering
Complete Design and Engineering
PSC Evidentiary Hearing
CPCN Approval
Construction Start
Project Service Date
Left-Click and DRAG Slider Bar to Reveal Existing and Proposed Conditions
Photo Simulation
View looking north from Whiteford Rd. This project is subject to PSC approval and design changes.
Viewpoint Location Map
Construction Sequence
Construction sequence graphics are intended to provide an overview of the typical construction sequence for a project. These graphics are used to give stakeholders a general idea of what to expect regarding this project’s construction process and effort. This project is subject to PSC approval and design changes.
Maryland Line to Five Forks
Right-of-Way Path
Contact BGE
If you have any questions about this project, please contact BGE at BGEProject@BGE.com and refer to the Maryland Line to Five Forks 115 kV Line Rebuild Project. Please include your name and address for prompt follow-up.